- Release Date: 19/04/13 17:17
- Summary: MINE: NZO: Kisaran Exploration Well: Testing to Commence
- Price Sensitive: No
- Download Document 973B
NZO 19/04/2013 15:17 MINE REL: 1517 HRS New Zealand Oil and Gas Limited MINE: NZO: Kisaran Exploration Well: Testing to Commence Preparations are being made to begin flow testing at the Parit Minyak-2 (PM-2) exploration well, located in the Kisaran PSC in onshore Sumatra, Indonesia. Based on wireline logging results, up to four drill stem tests (DSTs) will be conducted within a gross interval of 7700 to 9000 feet. Depending on the types of fluids and rates of flow, this testing program could take 20-35 days. New Zealand Oil & Gas Ltd has a 22.5% stake in the joint venture through the share ownership of its subsidiary NZOG Asia Pty Ltd in Pacific Oil & Gas (North Sumatera) Ltd. The Kisaran Joint Venture partners are Pacific Oil & Gas (Kisaran) Ltd (55 per cent and operator) and Pacific Oil & Gas (Sumatera) Inc. (22.5 per cent). John Pagani External Relations Manager M: +64 21 570 872 End CA:00235378 For:NZO Type:MINE Time:2013-04-19 15:17:06
Ann: MINE: NZO: Kisaran Exploration Well: Testing
Add to My Watchlist
What is My Watchlist?