- Release Date: 30/09/13 15:47
- Summary: MINE: NZO: Kisaran Exploration Well: Testing to commence in PM-3
- Price Sensitive: No
- Download Document 1.07KB
NZO 30/09/2013 12:47 MINE REL: 1247 HRS New Zealand Oil and Gas Limited MINE: NZO: Kisaran Exploration Well: Testing to commence in PM-3 Preparations are underway to begin flow testing in the Parit Minyak-3 (PM-3) well located in the Kisaran PSC in onshore Sumatra, Indonesia. Based on wireline logging results, up to two drill stem tests (DSTs) will be conducted. The first will be an open hole test over a gross interval of 246 feet, the second will be in cased hole over a gross interval of 62 feet. Depending on the types of fluids and rates of flow, this testing program could take 15-20 days. The well has been drilled to a total depth (TD) of 8760 feet (2670 metres). New Zealand Oil & Gas Ltd has a 22.5 per cent stake in the joint venture through its subsidiary NZOG Asia Pty Ltd. The Kisaran Joint Venture partners are Pacific Oil & Gas (55 per cent and Operator) and Pacific Oil & Gas (Sumatera) Ltd, a subsidiary of Bukit Energy Inc. (22.5 per cent). John Pagani External Relations Manager M: +64 21 570 872 End CA:00241779 For:NZO Type:MINE Time:2013-09-30 12:47:02
Ann: MINE: NZO: Kisaran Exploration Well: Testing
Add to My Watchlist
What is My Watchlist?