- Release Date: 25/02/13 11:15
- Summary: MINE: NZO: Kisaran Exploration Well weekly progress report
- Price Sensitive: No
- Download Document 1.09KB
NZO 25/02/2013 09:15 MINE REL: 0915 HRS New Zealand Oil and Gas Limited MINE: NZO: Kisaran Exploration Well weekly progress report New Zealand Oil & Gas advises that as at 11.00AM Sunday 24 February (NZT), the following operations were completed at exploration well Parit Minyak-2 (PM-2), located in the Kisaran PSC in onshore Sumatra, Indonesia: The well has been drilled to 1809 feet (551m). During most of the last week the drill was not operating while waiting on a replacement gearbox for a mud pump. The well has an expected total depth of 9000 feet (2743M). The first of several drilling targets is a Pliocene Fan at approximately 5772 feet (1744M). New Zealand Oil & Gas Ltd has a 22.5% stake in the joint venture through the share ownership of its subsidiary NZOG Asia Pty Ltd in Pacific Oil & Gas (North Sumatera) Ltd. The Kisaran Joint Venture partners are Pacific Oil & Gas (Kisaran) Ltd (55 per cent and operator) and Pacific Oil & Gas (Sumatera) Inc. (22.5 per cent). John Pagani External Relations Manager M: +64 21 570 872 End CA:00233387 For:NZO Type:MINE Time:2013-02-25 09:15:37
Ann: MINE: NZO: Kisaran Exploration Well weekly p
Add to My Watchlist
What is My Watchlist?