- Release Date: 08/10/13 10:30
- Summary: MINE: NZO: Kisaran Exploration Well weekly update
- Price Sensitive: No
- Download Document 1.06KB
NZO 08/10/2013 08:30 MINE REL: 0830 HRS New Zealand Oil and Gas Limited MINE: NZO: Kisaran Exploration Well weekly update The first open hole Drill Stem Test (DST) has been completed over a gross interval of 246 feet in the Parit Minyak-3 (PM-3) well located in the Kisaran PSC in onshore Sumatra, Indonesia. NZ Oil & Gas is currently waiting for regulatory approval to release testing results. Preparations are being made for a second DST in cased hole over a gross interval of 62 feet. Depending on the types of fluids and rates of flow, this testing program could take 15-20 days. The well has been drilled to a total depth (TD) of 8760 feet (2670 metres). New Zealand Oil & Gas Ltd has a 22.5 per cent stake in the joint venture through its subsidiary NZOG Asia Pty Ltd. The Kisaran Joint Venture partners are Pacific Oil & Gas (55 per cent and Operator) and Pacific Oil & Gas (Sumatera) Ltd, a subsidiary of Bukit Energy Inc. (22.5 per cent). John Pagani External Relations Manager M: +64 21 570 872 End CA:00242079 For:NZO Type:MINE Time:2013-10-08 08:30:04
Ann: MINE: NZO: Kisaran Exploration Well weekly u
Add to My Watchlist
What is My Watchlist?