- Release Date: 30/12/13 11:52
- Summary: MINE: NZO: Matuku-1 weekly progress report
- Price Sensitive: No
- Download Document 1.02KB
NZO 30/12/2013 09:52 MINE REL: 0952 HRS New Zealand Oil and Gas Limited MINE: NZO: Matuku-1 weekly progress report As at 6.00AM Sunday, 29 December, the Matuku-1 well in PEP 51906 offshore Taranaki had been drilled to 3167 metres after setting 13 3/8" casing at 1494 metres. A cement plug has been set across suspected debris at the base of the well and the next activity is to drill a 12 1/4" sidetrack hole to 3400 metres and set 9 5/8" casing. The Kan Tan IV began drilling operations on Saturday, 30 November. Matuku-1 is in 130 metres of water. Participants in PEP 51906 are OMV New Zealand (Operator) 65 per cent; Octanex 22.5 per cent; and New Zealand Oil & Gas 12.5 per cent. If Matuku-1 is successful, either New Zealand Oil & Gas or Octanex may exercise an option for New Zealand Oil & Gas to acquire a further 5 per cent of Octanex's share, which would equalise each company's interest at 17.5 per cent. John Pagani External Relations Manager +64 21 570 872 End CA:00245722 For:NZO Type:MINE Time:2013-12-30 09:52:30
Ann: MINE: NZO: Matuku-1 weekly progress report
Add to My Watchlist
What is My Watchlist?