- Release Date: 31/01/14 17:18
- Summary: MINE: NZO: Matuku operations complete as Pateke nears
- Price Sensitive: No
- Download Document 1.28KB
NZO 31/01/2014 15:18 MINE REL: 1518 HRS New Zealand Oil and Gas Limited MINE: NZO: Matuku operations complete as Pateke nears The Matuku-1 well in PEP 51906 offshore Taranaki has been plugged, the operator has advised. The semi-submersible drilling rig, Kan Tan IV, will next move to the Pateke prospect in the Tui oil fields in PMP 38158. Drilling operations at Matuku began on 30 November and the well was drilled to 4,846 metres. As previously advised, the well did encounter expected sandstones in the primary and secondary targets (Kapuni Group F-sands and North Cape Formation) but commercial volumes of oil and gas were not present. Pateke-4H is a northern extension of the existing Pateke reservoir in the Tui fields that are already producing. Pateke-4H is expected to take around two months to drill to a depth of 3,655 metres. A separate advisory will be issued when drilling commences in the well. Participants in PEP 51906 are OMV New Zealand (Operator) 65 per cent; Octanex 22.5 per cent; and New Zealand Oil & Gas 12.5 per cent. In Tui the partners are AWE , 57.5 per cent (operator); New Zealand Oil & Gas, 27.5 per cent; and Pan Pacific Petroleum, 15 per cent. john Pagani External Relations Manager +64 21 570 872 End CA:00246561 For:NZO Type:MINE Time:2014-01-31 15:18:32
Ann: MINE: NZO: Matuku operations complete as Pat
Add to My Watchlist
What is My Watchlist?