First 18-miles of the West Su Access Rd (WSAR) and a bridge across the Susitna River are now budget approved and part of the State Transportation Improvement Plan now approved by federal highway officials. See news article here https://www.frontiersman.com/news/road-extension-new-bridge-on-susitna-now-part-of-state-s-approved-transportation-plan/article_90698524-ee46-11ee-acca-83b3075839fa.html
Answering a few queries here today
@nissassa as some others have mentioned here too, a higher POG effectively makes the pit bigger as lower grade ore now becomes profitable. Note the pit shells in Vrify have not been updated to reflect the S-K 1300 MRE. They are still based on the JORC compliant resources.
@danbradster as the announcement today said, the S-K 1300 MRE is based on all the same assumptions that were used the Scoping study in-pit resources, except for the higher POG and pit slopes. It does not include the 2023 drilling or the anything to do with heap leaching which is currently being tested as part of the PFS level studies
@straw_woods Sorry I can't reply to the question you posted on the other thread currently, but I didn't want you think I was ignoring you.
- Forums
- ASX - By Stock
- Ann: Mineral Resource Estimate for US listing
First 18-miles of the West Su Access Rd (WSAR) and a bridge...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
27.0¢ |
Change
-0.010(3.57%) |
Mkt cap ! $57.50M |
Open | High | Low | Value | Volume |
28.5¢ | 28.5¢ | 27.0¢ | $12.05K | 44.10K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.0¢ | 7500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 0.270 |
2 | 26603 | 0.265 |
4 | 155028 | 0.260 |
2 | 40000 | 0.255 |
4 | 64502 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 39644 | 4 |
0.310 | 49826 | 2 |
0.315 | 7626 | 3 |
0.320 | 7860 | 2 |
0.325 | 468 | 1 |
Last trade - 16.10pm 02/05/2024 (20 minute delay) ? |
|
|||||
Last
28.0¢ |
  |
Change
-0.010 ( 3.25 %) |
|||
Open | High | Low | Volume | ||
27.0¢ | 28.0¢ | 27.0¢ | 5390 | ||
Last updated 15.06pm 02/05/2024 ? |
Featured News
NVA (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online