Cathedral is still inferred and under-drilled, so I don't know...

  1. 5,667 Posts.
    lightbulb Created with Sketch. 1394
    Cathedral is still inferred and under-drilled, so I don't know how that would work for PFS (if inferred is not allowed, but the US resource assumed Cathedral has now become economic and jumped to in-pit).

    If heap leach looks positive, then Cathedral would likely need more drilling. But just how much would it boost PFS NPV, so would it cause any delay while upgrading it to M&I (if little boost to NPV, then ignore it in PFS?).




    Cathedral: global MRE is 0.26gt. In-pit is 0.28g/t. Korbel in-pit is 0.3g/t. Not bad grade relative to Korbel (pit slopes may have helped) - but it's very much inferred. And Cathedral's in-pit ounces actually shows quite high compared to Korbel (global MRE, Korbel is 3.3x Cathedral. In-pit, Korbel is just 2x Cathedral). So Cathedral could boost production a fair bit?
    https://hotcopper.com.au/data/attachments/6104/6104979-24290bc7565cd626802eaa8604436648.jpg


    At a guess, Korbel has a lot of deep or low grade resources below the pit. So in-pit is just 2.7/6.64Moz (41%). But Cathedral shows 1.35/2.01Moz in-pit (67%). I'm not sure why Cathedral appears better. There is no Vrify pit shell to check against.

    https://hotcopper.com.au/data/attachments/6104/6104985-03d081ae55f2bac3c58567a709cbc4c1.jpg


    https://hotcopper.com.au/data/attachments/6105/6105010-96f7809c342bc409c75f4ed48fb12ce5.jpg
    https://hotcopper.com.au/data/attachments/6105/6105011-6a4b72a5d0c9b1faca6d58133a51fa16.jpg
    It looks to assume the mountain is all ore. So little stripping needed, just mine it all. (Needs to be proven with drilling though).


    Korbel * Cathedral
    https://hotcopper.com.au/data/attachments/6105/6105020-fb7823a36cd8857d82ec21917e0285c7.jpg



    It looks like RPM North and South get a combined pit, which may help the economics. This could improve more when North Uphill results get included.
    https://hotcopper.com.au/data/attachments/6105/6105037-bd0c5e8bf9c04fdf8b4771d938656634.jpg

    Pit slope changes should help these vertical ore bodies.

    https://hotcopper.com.au/data/attachments/6105/6105077-f6795819d12d0ee24104c091d6730a68.jpg
    https://hotcopper.com.au/data/attachments/6105/6105085-b5a18dce4be78d3aac50c5d722d8fa72.jpg



    There's quite a lot of new details in there, almost like a SS3 (I didn't see a new NPV, but new pit outlines etc).

 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
28.0¢
Change
0.010(3.70%)
Mkt cap ! $57.50M
Open High Low Value Volume
28.0¢ 28.0¢ 28.0¢ $4.456K 15.91K

Buyers (Bids)

No. Vol. Price($)
1 2000 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
28.0¢ 4520 1
View Market Depth
Last trade - 11.32am 03/05/2024 (20 minute delay) ?
Last
28.0¢
  Change
0.010 ( 0.00 %)
Open High Low Volume
27.0¢ 28.0¢ 27.0¢ 5170
Last updated 11.32am 03/05/2024 ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.