EM2 10.7% 8.3¢ eagle mountain mining limited

Ann: Mineral Resource Estimate Increased to 28Mt @ 1.35% Copper, page-34

  1. 7,533 Posts.
    lightbulb Created with Sketch. 1776
    Can anyone tell me the upper end of the range for US copper mine production and processing costs? Are there miners operating for
 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
8.3¢
Change
0.008(10.7%)
Mkt cap ! $32.60M
Open High Low Value Volume
7.5¢ 8.5¢ 7.5¢ $365.0K 4.544M

Buyers (Bids)

No. Vol. Price($)
1 25000 8.2¢
 

Sellers (Offers)

Price($) Vol. No.
8.3¢ 29999 1
View Market Depth
Last trade - 16.10pm 15/05/2024 (20 minute delay) ?
Last
8.2¢
  Change
0.008 ( 10.8 %)
Open High Low Volume
7.4¢ 8.5¢ 7.4¢ 2315740
Last updated 15.55pm 15/05/2024 ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.