The Wiluna Mining Centre is located in the Goldfields region WA & consists of a large, long-life open pit & underground mining operation.
Ahead of production beginning in December '21, Wiluna has updated the Mineral Resource for the project via roughly 175,000 metres of drilling.
Wiluna’s Mineral Resource now sits at 4.51 million ounces at 3.9 grams per tonne (g/t) gold, including a High-Grade Resource of 3.11 million ounces at 5.81 g/t gold.
The company explained the Mineral Resource for Wiluna now includes the Wiluna deposits, the Matilda, Lake Way and Galaxy deposits, stockpiles, and tailings.
Additionally, the mine’s Measured and Indicated Resources increased by 28% to 2.73 million ounces at 4.46 g/t gold.
Wiluna added the project has a growing high-grade gold endowment of 15,000 ounces per vertical metre over three main gold structures with a combined strike length of over 10 kilometres.
Wiluna is targeting production of 52,000 ounces in FY21, before expanding to roughly 120,000 ounces per year by June 2022 and then 250,000 ounces by FY24.
Stockpiles of 100,000 tonnes of development ore are already ready for processing
through the concentrator, with first gold concentrate expected from January '22.
https://themarketherald.com.au/wiluna-mining-asxwmc-releases-mineral-resource-update-2021-11-17/
- Forums
- ASX - By Stock
- WMC
- Ann: Mineral Resource Update
Ann: Mineral Resource Update, page-14
Featured News
Add WMC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online