People totally missing the point with this resource upgrade, it’s designed to be sufficient JORC resource to underpin the BFS and get into production as soon as possible.
Once revenue commences HIO will be able to continue exploring/drilling and building out the resource towards the long term target of billions of tonnes.
So this resource upgrade is really the start, not the end. It’s hard to see where the ceiling is with this ore body!
- Forums
- ASX - By Stock
- Ann: Mineral Resource Upgrade Delay
People totally missing the point with this resource upgrade,...
- There are more pages in this discussion • 85 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HIO (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $31.31M |
Open | High | Low | Value | Volume |
3.1¢ | 3.2¢ | 3.1¢ | $4.85K | 153.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 709759 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 670963 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 709759 | 0.031 |
25 | 1480822 | 0.030 |
9 | 1170766 | 0.029 |
4 | 627000 | 0.028 |
5 | 76743 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 670963 | 5 |
0.033 | 2442121 | 8 |
0.034 | 643206 | 2 |
0.035 | 148430 | 3 |
0.037 | 695030 | 4 |
Last trade - 16.10pm 07/05/2024 (20 minute delay) ? |
|
|||||
Last
3.1¢ |
  |
Change
0.000 ( 3.13 %) |
|||
Open | High | Low | Volume | ||
3.1¢ | 3.2¢ | 3.1¢ | 173868 | ||
Last updated 15.59pm 07/05/2024 ? |
Featured News
HIO (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online