GAL 6.45% 14.5¢ galileo mining ltd

And the beauty of AI. $BN108. Yes that's right Billion!Thank you...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 328 Posts.
    lightbulb Created with Sketch. 62
    And the beauty of AI. $BN108. Yes that's right Billion!
    Thank you for providing this detailed information about the lithium resource estimate. Your analysis covers key aspects of evaluating a potential lithium deposit, including grade conversion, tonnage estimation, and value calculation. Here's a brief summary of the main points and some additional considerations:
    Key points:
    1. The lithium grade (5000 ppm Li) converts to approximately 1.0765% Li2O.
    2. This grade is considered significant for lithium exploration
    3. The estimated tonnage is about 10.8 million tonnes.
    4. A rough value estimate, based on hypothetical conditions, suggests a potential of $108 billion.
    Additional considerations:
    1. Geological uncertainty: The estimate assumes uniform mineralization throughout the pegmatite body, which may not be the case in reality. Variability in lithium concentration could significantly affect the overall resource estimate.
    2. Recovery rates: The value calculation doesn't account for recovery rates during mining and processing, which are typically less than 100%. This could reduce the actual recoverable lithium.
    3. Capital and operating costs: The valuation doesn't consider the substantial costs associated with developing and operating a lithium mine, which would impact the project's net value.
    4. Market dynamics: Lithium prices are volatile and subject to supply-demand fluctuations. The assumed price of $10,000 per tonne of LCE may not hold over time.
    5. Environmental and regulatory factors: These can significantly impact the feasibility and timeline of lithium mining projects.
    6. Further exploration: More detailed drilling and sampling would be necessary to upgrade this initial estimate to a more reliable resource classification (e.g., measured and indicated resources).Would you like me to elaborate on any specific aspect of this analysis or discuss additional factors that could influence the resource estimate and its potential value?
 
watchlist Created with Sketch. Add GAL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.