Drilling for a project in a floodplain where CCZ is drilling, should be very different to mining.
Drilling program is greatly influenced by even light rain especially in a muddy area which can make relocating small bulky equipment hard to impossible. Let alone a small rig.
It is the mud soil in the area that is the biggest factor, in how fast a drill rig can be repositioned.
Furthermore mining open pit 101 is once mining start the initial earth removed is used to channel water away from the mine.
So after mine starts only heavy or torrential weather significantly reduces mining output.
- Forums
- ASX - By Stock
- CCZ
- Ann: Mineralisation intercepted, up to 17.5m thick, at Big One
Ann: Mineralisation intercepted, up to 17.5m thick, at Big One, page-72
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $6.498M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $15.13K | 2.966M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 435899 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 1289357 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 435899 | 0.005 |
30 | 12346362 | 0.004 |
10 | 5676998 | 0.003 |
11 | 8459429 | 0.002 |
9 | 10052005 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 1289357 | 2 |
0.007 | 4510087 | 10 |
0.008 | 2251255 | 7 |
0.009 | 3157361 | 5 |
0.010 | 2500000 | 3 |
Last trade - 15.42pm 28/06/2024 (20 minute delay) ? |
Featured News
CCZ (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online