CCZ 16.7% 0.5¢ castillo copper limited

Drilling for a project in a floodplain where CCZ is drilling,...

  1. 2,723 Posts.
    lightbulb Created with Sketch. 506

    Drilling for a project in a floodplain where CCZ is drilling, should be very different to mining.

    Drilling program is greatly influenced by even light rain especially in a muddy area which can make relocating small bulky equipment hard to impossible. Let alone a small rig.

    It is the mud soil in the area that is the biggest factor, in how fast a drill rig can be repositioned.

    Furthermore mining open pit 101 is once mining start the initial earth removed is used to channel water away from the mine.

    So after mine starts only heavy or torrential weather significantly reduces mining output.

    Last edited by ipv6ready: 26/07/21
 
watchlist Created with Sketch. Add CCZ (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
-0.001(16.7%)
Mkt cap ! $6.498M
Open High Low Value Volume
0.6¢ 0.6¢ 0.5¢ $15.13K 2.966M

Buyers (Bids)

No. Vol. Price($)
3 435899 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 1289357 2
View Market Depth
Last trade - 15.42pm 28/06/2024 (20 minute delay) ?
CCZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.