Another step in the right direction
"Canyon will not need to assign capital to upgrade the existing rail infrastructure for the Project." TICK
"Significant potential to exceed the 5Mtpa throughput base case" TICK
I believe that 10MT has already been mentioned, by using longer trains
Looks like Canyon is well on track
- Forums
- ASX - By Stock
- CAY
- Ann: Minim Martap Project Confirmation of Rail Bridge Suitability
Ann: Minim Martap Project Confirmation of Rail Bridge Suitability, page-4
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.0¢ |
Change
-0.004(4.76%) |
Mkt cap ! $113.1M |
Open | High | Low | Value | Volume |
8.4¢ | 8.4¢ | 8.0¢ | $195.9K | 2.446M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2335480 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2035480 | 0.080 |
5 | 6525316 | 0.079 |
1 | 100000 | 0.077 |
2 | 750000 | 0.076 |
1 | 5300000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 100000 | 1 |
0.084 | 345680 | 4 |
0.085 | 364900 | 4 |
0.086 | 430000 | 2 |
0.087 | 230000 | 1 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
CAY (ASX) Chart |