CAY 4.76% 8.0¢ canyon resources limited

Ann: Minim Martap Project Confirmation of Rail Bridge Suitability, page-4

  1. 806 Posts.
    lightbulb Created with Sketch. 231

    Another step in the right direction

    "Canyon will not need to assign capital to upgrade the existing rail infrastructure for the Project." TICK

    "Significant potential to exceed the 5Mtpa throughput base case" TICK

    I believe that 10MT has already been mentioned, by using longer trains


    Looks like Canyon is well on track
 
watchlist Created with Sketch. Add CAY (ASX) to my watchlist
(20min delay)
Last
8.0¢
Change
-0.004(4.76%)
Mkt cap ! $113.1M
Open High Low Value Volume
8.4¢ 8.4¢ 8.0¢ $195.9K 2.446M

Buyers (Bids)

No. Vol. Price($)
4 2335480 8.0¢
 

Sellers (Offers)

Price($) Vol. No.
8.3¢ 100000 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
CAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.