The top 20 own 85% and are strong holders over the years some paid $3,07 for shares so the wont sell at these low prices. GWR has already spent over $70,000,000 drilling the Iron Ore and grading the Ore % areas, the transport to port is the final hurdle.Overall GWR have around 500 million tonnes of Iron Ore all up, the 125 million tonnes is just the very high grade ore.This is a large potential project so a 33 mill market cap is only 50 % of what we have spent on drilling so far GWR is still massively undervalued.August 2008 if you want to read the report or read post number 39308372 by Kate Moss. CHEERS
- Forums
- ASX - By Stock
- GWR
- Ann: Mining Approvals Obtained for C4 Iron Ore Deposit
Ann: Mining Approvals Obtained for C4 Iron Ore Deposit, page-26
-
- There are more pages in this discussion • 108 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.9¢ |
Change
-0.006(7.06%) |
Mkt cap ! $25.37M |
Open | High | Low | Value | Volume |
8.5¢ | 8.5¢ | 7.9¢ | $111.5K | 1.382M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50704 | 7.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 31595 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50704 | 0.079 |
2 | 300000 | 0.078 |
1 | 83597 | 0.077 |
2 | 550000 | 0.076 |
2 | 566666 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 31595 | 1 |
0.085 | 362194 | 2 |
0.098 | 20000 | 1 |
0.100 | 91375 | 2 |
0.110 | 5500 | 1 |
Last trade - 15.57pm 16/09/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |