the Simandou project had cap ex of US 20b before inflation and higher rates took hold. Then there’s execution risk given the number of tunnels, length of railway, port upgrades etc. only a miracle would see any production before 2027
- Forums
- ASX - By Stock
- FMG
- Ann: Mining Convention Signed for the Belinga Iron Ore Project
Ann: Mining Convention Signed for the Belinga Iron Ore Project, page-8
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$18.99 |
Change
0.120(0.64%) |
Mkt cap ! $58.46B |
Open | High | Low | Value | Volume |
$19.38 | $19.38 | $18.91 | $211.5M | 11.08M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 130 | $18.96 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$19.00 | 130177 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 130 | 18.960 |
2 | 153 | 18.950 |
1 | 79 | 18.940 |
5 | 2399 | 18.930 |
1 | 1500 | 18.920 |
Price($) | Vol. | No. |
---|---|---|
19.000 | 130177 | 4 |
19.010 | 20456 | 4 |
19.040 | 43389 | 2 |
19.070 | 54306 | 3 |
19.100 | 58749 | 3 |
Last trade - 16.10pm 01/08/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |