The DFS proved the Project’s economic credentials with a post tax NPV10 of USD1.028 billion over the LoM, generating 2,500 jobs US$2,348 M1 pre-tax NPV10 andUS$1,028 M1 post-tax NPV10▪ Internal Rate of Return of 53% (pre-tax)1 and 33% (post-tax)1
1Based on 100% of project interest. AVZ holds 60% of the project with an option to increase to 75%