I think they should be able to have the processing plant producing and be exporting tin concentrate by the 23rd of April. That should get the share price close to double the minimum [for Lind], around 3 cents. I consider it likely but only believable when it happens.
I am bullish the same as 95% of holders.
- Forums
- ASX - By Stock
- C7A
- Ann: Mining of First Ore Block at Granville Tin Project
Ann: Mining of First Ore Block at Granville Tin Project, page-203
-
- There are more pages in this discussion • 153 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add C7A (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.916M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1793703 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 3266090 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1793703 | 0.007 |
8 | 4265911 | 0.006 |
12 | 6150194 | 0.005 |
4 | 1549995 | 0.004 |
2 | 1699995 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 3266090 | 5 |
0.009 | 441740 | 2 |
0.010 | 1169471 | 4 |
0.011 | 1069816 | 5 |
0.012 | 144610 | 2 |
Last trade - 10.02am 04/11/2024 (20 minute delay) ? |
Featured News
C7A (ASX) Chart |
Day chart unavailable