CAI 0.00% 11.5¢ calidus resources limited

Ann: Mining ramps up ahead of 1st production in June quarter 2022, page-224

  1. 2,342 Posts.
    lightbulb Created with Sketch. 1176
    From Nov21 preso:

    Stage 1
    • LOM AISC $1,290/oz - Initial 8-year mine life

    Stage 2 incl Blue Spec (to be confimed via June22 DFS)
    Capital of $28M funded from Stage 1 Cashflows
    • ~A$1,292/oz AISC over life of mine

    Comments on costs:
    Costs
    • Unit rates locked in for mining
    • Fixed power costs per kw/hr
    • Labour – anticipating cost implications
    • Consumables – Rising AUD creates potential to save
    • Costs mainly dependent on ounces produced, see above

 
watchlist Created with Sketch. Add CAI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.