re: Ann: Mining Study Update - Yukon Base Met... Sorry to bombard you tonight guys but here's another more detailed evaluation done in 08 on Andrew alone, note the higher zinc price $2,500t with a sub 60m capex and IRR of 114%.
how could capex & production costs change so dramatically ???????? there's something more to this story I think
http://www.abnnewswire.net/press/en/50690/Overland_Resources_(ASX:OVR)_Study_Concludes_The_Canadian_Andrew_Zinc_Deposit_Is_Economically_Feasible.html
- Forums
- ASX - By Stock
- Ann: Mining Study Update - Yukon Base Metal Proje
re: Ann: Mining Study Update - Yukon Base Met... Sorry to...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNX (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
-0.001(10.0%) |
Mkt cap ! $11.52M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.9¢ | $6.19K | 690.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 500000 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 6045200 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 500000 | 0.009 |
19 | 3989676 | 0.008 |
9 | 2576251 | 0.007 |
9 | 3681826 | 0.006 |
8 | 2140029 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 6045200 | 11 |
0.011 | 3646665 | 6 |
0.012 | 3234096 | 5 |
0.013 | 1083000 | 4 |
0.014 | 200625 | 3 |
Last trade - 14.46pm 05/07/2024 (20 minute delay) ? |
Featured News
RNX (ASX) Chart |