AZY 9.09% 1.2¢ antipa minerals limited

Ann: Minyari Dome Project - Drilling Set to Commence at Tetris, page-98

  1. 1,689 Posts.
    lightbulb Created with Sketch. 571

    https://hotcopper.com.au/data/attachments/5760/5760568-eac1b1e8543dad4b2f5e939051850430.jpg
    https://hotcopper.com.au/data/attachments/5760/5760571-555a849bd8d9626502508b883857b4dd.jpg
    https://hotcopper.com.au/data/attachments/5760/5760574-a12b290623b7f8e32a6d61cca87574ce.jpg

    Regional targets: On 9 November 2023, Antipa commenced an air core drill programme across four geochemical and/or geophysical anomalies located within 1.3km to 12km from the Minyari deposit. This programme consists of 105 drill holes for 5,000m, designed to test these four district targets. Assay results from this programme are expected to be returned February 2024.



    AZY started drilling this geochemical or geophysical target about 1.5 km East of Minyari, on around 9th November. Could this be the big daddy source of Minyari?!

 
watchlist Created with Sketch. Add AZY (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $49.61M
Open High Low Value Volume
1.1¢ 1.2¢ 1.1¢ $16.36K 1.487M

Buyers (Bids)

No. Vol. Price($)
8 7258128 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 12107472 10
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
1.1¢
  Change
0.001 ( 8.33 %)
Open High Low Volume
1.1¢ 1.2¢ 1.1¢ 524765
Last updated 15.57pm 09/05/2024 ?
AZY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.