Regional targets: On 9 November 2023, Antipa commenced an air core drill programme across four geochemical and/or geophysical anomalies located within 1.3km to 12km from the Minyari deposit. This programme consists of 105 drill holes for 5,000m, designed to test these four district targets. Assay results from this programme are expected to be returned February 2024.
AZY started drilling this geochemical or geophysical target about 1.5 km East of Minyari, on around 9th November. Could this be the big daddy source of Minyari?!
- Forums
- ASX - By Stock
- AZY
- Ann: Minyari Dome Project - Drilling Set to Commence at Tetris
Ann: Minyari Dome Project - Drilling Set to Commence at Tetris, page-98
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZY (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.001(9.09%) |
Mkt cap ! $49.61M |
Open | High | Low | Value | Volume |
1.1¢ | 1.2¢ | 1.1¢ | $16.36K | 1.487M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 7258128 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 12107472 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 7258128 | 0.011 |
32 | 10240982 | 0.010 |
15 | 5062002 | 0.009 |
12 | 6384125 | 0.008 |
7 | 2462683 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 12107472 | 10 |
0.013 | 7662824 | 17 |
0.014 | 2421915 | 14 |
0.015 | 2605420 | 10 |
0.016 | 2135600 | 5 |
Last trade - 16.10pm 09/05/2024 (20 minute delay) ? |
|
|||||
Last
1.1¢ |
  |
Change
0.001 ( 8.33 %) |
|||
Open | High | Low | Volume | ||
1.1¢ | 1.2¢ | 1.1¢ | 524765 | ||
Last updated 15.57pm 09/05/2024 ? |
Featured News
AZY (ASX) Chart |