So we chased the coal seam for a further 506 meters beyond the intersection with Mira 2 giving us a total of 920 meters of horizontal well bore in coal. Not long to wait until Mira 2 comes back on line after the smaller work-over rig leaves having installed production tubing and a down-hole pump – with the plan being for that entire 920 meters of horizontal well-bore in the coal seam to flow gas and water into Mira 2.
Works completed under the anticipated time-frame even though the weather conditions were against us.
Our JV partners Santos and APLNG must be delighted that we took up the reigns and are driving Mahalo forward – as not only have we ‘cracked on’ but we have also done everything within budget.
As things stand – all parties especially us shareholders couldn’t have wished for a better outcome.
- Forums
- ASX - By Stock
- Ann: Mira 6 Successfully Drilled Through Nearly 1 km of Coal
So we chased the coal seam for a further 506 meters beyond the...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COI (ASX) to my watchlist
|
|||||
Last
18.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $204.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 19.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.5¢ | 8000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.190 |
3 | 367524 | 0.185 |
3 | 472000 | 0.180 |
1 | 250000 | 0.175 |
3 | 255880 | 0.170 |
Price($) | Vol. | No. |
---|---|---|
0.185 | 8000 | 1 |
0.190 | 46966 | 2 |
0.195 | 401552 | 5 |
0.200 | 982623 | 11 |
0.205 | 444256 | 6 |
Last trade - 07.11am 02/07/2024 (20 minute delay) ? |
Featured News
COI (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online