MKR manuka resources ltd.

Summary (from https://newsrush.ai/m_50.html)Manuka Resources Ltd...

  1. 28 Posts.
    lightbulb Created with Sketch. 78
    Summary (from https://newsrush.ai/m_50.html)

    Manuka Resources Ltd (MKR)

    MKR Targeting Near-Term Gold and Silver Production in Cobar

    16 April 2024 9:14 AM | 6 Pages

    Manuka Resources Limited announces near-term gold and silver production from its Cobar Basin Projects with significant investments and updates.

    Summary

    • Manuka Resources Limited is targeting near-term gold and silver production from its Mt Boppy Gold Mine and Wonawinta Silver Mine.
    • An on-site processing facility for gold production at Mt Boppy is expected to significantly enhance economics, with a capital cost of A$10-15M.
    • The Mt Boppy site is fully permitted, with the processing facilities scheduled for Q4 2024.
    • An updated Reserve and production plan for the Wonawinta Silver Mine is targeted for release in May 2024.
    • The company anticipates savings in ore haulage alone to be around A$6-7 million per year.
    • Manuka has increased the gold resource from 31,000 ounces to 160,000 ounces since acquiring Mt Boppy in 2019.

    Highlights

    • Capital cost for on-site processing facilities
    • Savings in ore haulage per year
    • Gold resource increase since 2019
    • Silver production in 2012-2013
    • Silver production in 2022
    • Total Resources at Wonawinta
    • Installation and production start date for processing facilities
    • Updated Reserve and production plan release for Wonawinta

    Positives

    • Ownership of two significant mining projects in the Cobar Basin.
    • Enhanced economics and value from on-site processing facility.
    • Fully permitted site for proposed processing plant and on-site production.
    • Significant savings in ore haulage costs.
    • Increased resource estimate significantly since acquisition.
    • Opportunity to leverage buoyant gold and silver markets.

    Negatives

    • Capital expenditure of A$10-15M required for new processing facilities.
    • Operational risks associated with transitioning to on-site processing.
    • Dependence on gold and silver market prices for profitability.

    Key Dates

    • Q4 2024: Installation, commissioning, and production start for the on-site processing facilities at Mt Boppy.
    • May 2024: Release of updated Reserve and production plan for Wonawinta Silver Mine.

    Alerts

    • Contains better than expected results: yes
    • Contains worse than expected results: no
    • Contains expected results: no
    • Sentiment: positive
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.7¢
Change
-0.003(7.50%)
Mkt cap ! $30.84M
Open High Low Value Volume
4.1¢ 4.1¢ 3.7¢ $37.46K 979.9K

Buyers (Bids)

No. Vol. Price($)
2 124426 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 94059 1
View Market Depth
Last trade - 16.10pm 16/06/2025 (20 minute delay) ?
MKR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.