From WA Govt , The project is at stage 5 which is the implemtation of proposal. All EPA regulations are complete. This is a very strong near term project for a company at $4Mi MC. Good pick up cheap.
drifta
The proposal is to extract about 3.7 million tonnes of ore from about 30 hectares of land at Jangardup each year, to produce 271,000 tonnes of heavy mineral concentrate for trucking to Bunbury annually. The proposed mine life is eight years. Mining would be by a floating dredge feeding a wet separator. On average, some 56 truck trips (28 full, 28 return) per day would be required to transport the product to Bunbury.
http://www.epa.wa.gov.au/proposals/heavy-minerals-mine-jangardup
- Forums
- ASX - By Stock
- Ann: ML application over Jangardup South heavy mineral deposit
From WA Govt , The project is at stage 5 which is the...
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SER (ASX) to my watchlist
|
|||||
Last
1.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.03M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.5¢ | $14.54K | 945.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 4809121 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 1783277 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 4809121 | 0.015 |
2 | 1700000 | 0.014 |
3 | 1116961 | 0.013 |
1 | 1000000 | 0.012 |
3 | 1136905 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 1783277 | 5 |
0.018 | 500000 | 1 |
0.019 | 476943 | 5 |
0.020 | 395307 | 4 |
0.021 | 216166 | 3 |
Last trade - 16.10pm 29/07/2024 (20 minute delay) ? |
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?
SER (ASX) Chart |