SER 0.00% 1.5¢ strategic energy resources limited

From WA Govt , The project is at stage 5 which is the...

  1. 6,600 Posts.
    lightbulb Created with Sketch. 523
    From WA Govt , The project is at stage 5 which is the implemtation of proposal. All EPA regulations are complete. This is a very strong near term project for a company at $4Mi MC. Good pick up cheap.
    drifta

    The proposal is to extract about 3.7 million tonnes of ore from about 30 hectares of land at Jangardup each year, to produce 271,000 tonnes of heavy mineral concentrate for trucking to Bunbury annually. The proposed mine life is eight years. Mining would be by a floating dredge feeding a wet separator. On average, some 56 truck trips (28 full, 28 return) per day would be required to transport the product to Bunbury.


    http://www.epa.wa.gov.au/proposals/heavy-minerals-mine-jangardup
 
watchlist Created with Sketch. Add SER (ASX) to my watchlist
(20min delay)
Last
1.5¢
Change
0.000(0.00%)
Mkt cap ! $10.03M
Open High Low Value Volume
1.6¢ 1.6¢ 1.5¢ $14.54K 945.7K

Buyers (Bids)

No. Vol. Price($)
18 4809121 1.5¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 1783277 5
View Market Depth
Last trade - 16.10pm 29/07/2024 (20 minute delay) ?
SER (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.