not quite right there gossy
but to answer your question, a plan to be at 50 mmcfd gas plus 100 bbl/mmcf condy by 2026 is...easy once funding found
one well will be about 1k boepd average over its first year
and 50 mmcfpd is about 8k boepd, and will come with ~100 bbl/mmcf of condy which is 5k boepd
add together gas and condy is 13k boepd, which is about tommy lakes capacity
so ~10-13 wells will fill tommy
the 35 contingent pending wells will maintain tommy and the 50 mmcfpd and 100 bbl/mmcf condy (13k boepd) at peak for 10 years until 2035 (before slow decline)
about 5-10 wells drilled per year will maintain that production against the decline
the announcement refers to the total number of wells in each category
so there is a total of 35 2C pending wells, 89 2C onhold wells and 92 prospective = 216 wells all up on the reduced land
this number of wells will double if they get access back to the expired leases, which is likely
so the production figure has a 250 mmcfpd of gas project (250/6=42k boepd), add ~100 bbl/mmcf condy (250*100 = 25k boepd)
so thats 67k boepd...and potential to double with the other leases
at $4 gas, thats $370m annual revenue and most of the revenue (~70%) will come from condensate if 100bbl/mmcf
additional processing facilities cost about $100m per 100 mmcf
getting some idea of the possible scale?
- Forums
- ASX - By Stock
- Ann: Montney Contingent and Prospective Resource Update
not quite right there gossybut to answer your question, a plan...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.700M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable