tommy is tommy lakes gas pipelines, gas-liquids separation plant, and pumping stations
all owned by ce1
this is the first half of the trip from ce1 montney wellheads to tommy lakes and then on to jedney gas processing thru wet gas pipelines
jedney (not owned by ce1) will deep cut (strip final liquids out of gas stream) the gas to make dry gas that can be transported on dry gas pipelines to lng canada and others
tommy has plenty of room for expansion, and pumping gas west to other large pipelines...after ce1 fill tommy and eastern pipes with 11k boepd
read this
https://hotcopper.com.au/threads/ann-calima-secures-tommy-lakes-infrastructure.5233291/?post_id=43013239
https://calimaenergy.com/wp-content/uploads/2020/06/Tommy-Lakes-Slide-Deck-17-02-20.pdf
- Forums
- ASX - By Stock
- Ann: Montney Contingent and Prospective Resource Update
tommy is tommy lakes gas pipelines, gas-liquids separation...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.571M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable