so the q for me is how realistic is the montney dvpt plan by 2026 - to get to 50mmcf/d it needs an extra 33 wells drilled, then to get to 150mmcf/d, it needs another 89 wells. this is on top of the 2 they have drilled. does the kit even exist to do that?
so the q for me is how realistic is the montney dvpt plan by...
Add to My Watchlist
What is My Watchlist?