Does not matter where the drill holes start off - its where they intersect Li2O mineralization that matters, in this cross-section view the drilling is designed to test continuity up dip up along the tabular Pegmatite host, so that's the one dimension tested on cross-section.
The other two dimensions are in the plan view, note that they are drilling along strike and not just drilling everything on the one cross-section, that's another dimension along strike, the third dimension is thickness (either downhole or true width) and now that you have learned to read an announcement, and presumably have figured out what that column called Estimated True Width is, I can tell you that its also an important dimension to be drill testing because as a WR1 holder you should be aware that all orebodies often vary in thickness along strike and down dip, that's why drill programs are conducted.
Just like WR1 does, and every other mineral exploration company does with drilling.
AZS Price at posting:
$1.58 Sentiment: Hold Disclosure: Held