My understanding is the Wiluna operation has +20 years of sulphide flotation history which confirms the 90% recovery.
WMX are proposing to put in a new flotation plant to optimise the recoveries further.
GR Engineering are building the new Wiluna flotation plant and designing the DEG plant too.
- Forums
- ASX - By Stock
- Ann: More Excellent Results at Wiluna Mining Centre
My understanding is the Wiluna operation has +20 years of...
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)