CVN 2.50% 20.5¢ carnarvon energy limited

Highlights • Latest wireline results confirm more light oil in...

  1. 116 Posts.
    Highlights
    • Latest wireline results confirm more light oil in the Crespin and Milne Members
    • Adds another 40 metres of net oil pay
    • Total hydrocarbon net pay now 132 metres in the Dorado-1 well
    Carnarvon Petroleum Limited (“Carnarvon” or “the Company”; ASX:CVN) is pleased to confirm that the
    Quadrant-Carnarvon Joint Venture has made additional oil discoveries in the Crespin and Milne Members
    of its Dorado-1 well.
    The results, which follow the completion of the wireline evaluation, are in addition to those announced
    on 18 and 24 July 2018.
    Carnarvon’s Managing Director, Adrian Cook said the latest results make the Dorado result all the more
    impressive.
    “The oil discovered in the Caley Member is very significant in terms of its likely scale and in proving that
    this play works in the basin. Discovering more oil in the Crespin and Milne Members makes this a truly
    incredible find, for Dorado and for similar structures nearby that have been identified in Carnarvon and
    Quadrant’s prospect list.” Mr Cook said.
    Light oil has been recovered from the Crespin Member containing a gross hydrocarbon package of 50
    metres and a net oil pay thickness of 22 metres. The quality of the reservoir encountered was better
    than pre-drill estimates with average porosities of 14 per cent.
    Light oil was also recovered from the Milne Member containing a gross hydrocarbon package of 30
    metres and a net pay thickness of 18 metres. The average porosity of 13 per cent was also better than
    the pre-drill estimates.
    Pressure data has confirmed that the Dorado structure contains multiple oil columns in the Caley,
    Crespin and Milne Members and a gas and condensate column in the Baxter Member, aggregating to a
    total net hydrocarbon pay of 132 metres. The Caley, Baxter and Milne sands did not encounter any
    water, whereas the lower section of the Crespin sand contains an interpreted water contact.
    “With drilling and evaluation of the Dorado-1 well now completed, Carnarvon’s assessment of the
    hydrocarbon volumes associated with this discovery is now well underway.
    The hydrocarbon volumes will be announced to shareholders and investors as soon as possible.” Mr
    Cook said.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
20.5¢
Change
0.005(2.50%)
Mkt cap ! $366.6M
Open High Low Value Volume
20.0¢ 20.5¢ 20.0¢ $724.4K 3.558M

Buyers (Bids)

No. Vol. Price($)
6 279612 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 485773 5
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.