I would have thought this was extremely positive in relation to their confidence that the bottlenecks and production ramp up will continue to be sorted as without that this would be fairly pointless wouldn't it? Happy to be corrected if I've misunderstood something as I have only had a quick skim as I feel like ORE is just a waiting game for the time being.
- Forums
- ASX - By Stock
- AKE
- Ann: MOU for Development of Lithium Hydroxide Plant
Ann: MOU for Development of Lithium Hydroxide Plant, page-3
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)