I just google earthed Manono in the congo like they have a lot of work to do just to get the stuff to any port, it does not look like you just stroll down town and grab a fleet of trucks or earthmoving equipment, I could not see any bitumin roads in or out of the town, they won't be getting any processed spod out of there any time soon, but I could be wrong. It is taking our guys here in Aus a good two years or so to build a mine to operating, with most things a phone call away. Just a thought.
- Forums
- ASX - By Stock
- PLS
- Ann: MOU for South Korean Downstream Processing Facility
Ann: MOU for South Korean Downstream Processing Facility, page-55
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.88 |
Change
-0.040(1.37%) |
Mkt cap ! $8.673B |
Open | High | Low | Value | Volume |
$2.93 | $2.96 | $2.88 | $50.87M | 17.45M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 127610 | $2.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.90 | 103550 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 45872 | 2.880 |
10 | 105038 | 2.870 |
10 | 98093 | 2.860 |
40 | 230616 | 2.850 |
9 | 49778 | 2.840 |
Price($) | Vol. | No. |
---|---|---|
2.900 | 51000 | 5 |
2.910 | 8100 | 2 |
2.920 | 20622 | 4 |
2.930 | 165625 | 11 |
2.940 | 130765 | 9 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |