Hi PLSers, please correct me if I‘m wrong, if this deal with Polaris and LG Chem goes ahead, our 5MTpa mine will be completely sold out, and possibly a shortfall.
5Mtpa = 800,000T Chemical Gade Sodumene:
- Ganfeng 160,000T Stage 1 + 150,000T max Stage 2
- General Lithium 140,000T Stage 1
- GWM 150,000T max Stage 2
- Polaris/LG Chem 30,000T plant = 240,000T spod from PLS.
Total potential offtake agreement = 840,000T Chemical Grade Spodumene.
PLS will need to expand again to meet demand!!
I can‘t believe SP went backwards after this news, I don‘t think it‘ll be long before SP retest the all time high price again.
DYOR.
Frank.
- Forums
- ASX - By Stock
- Ann: MOU for South Korean Downstream Processing Facility
Hi PLSers, please correct me if I‘m wrong, if this deal with...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.11 |
Change
-0.090(2.81%) |
Mkt cap ! $9.360B |
Open | High | Low | Value | Volume |
$3.15 | $3.17 | $3.06 | $206.5M | 66.15M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 212414 | $3.11 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.12 | 1870994 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 212414 | 3.110 |
13 | 975137 | 3.100 |
10 | 3130733 | 3.090 |
35 | 2771589 | 3.080 |
55 | 725541 | 3.070 |
Price($) | Vol. | No. |
---|---|---|
3.120 | 988741 | 12 |
3.130 | 98096 | 6 |
3.140 | 345050 | 8 |
3.150 | 40909 | 7 |
3.160 | 106230 | 5 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online