Helps to pay attention to the type of drilling when reading this announcement, with RC drilling the pXRF results through green plastic bags are very much under-reporting the Cu grades, RC samples through calico sample bags only under-report Cu grades a bit, and using a pXRF on diamond drill core is quite difficult due to the heterogeneous nature of drill core and the small sensor window on the pXRF instrument.
This cross section is one of the best of the sections - Section D-D' is cut SW to NE and is looking towards the NW, possibly not the ideal way to drill this part of the ore body, but they are constrained by the ML boundary and can't just plonk the drill rig outside the Mining Lease and drill in the opposite direction as its HMX's ground I believe.
Very vertical orebodies which are obviously along various structures, but true widths look like mineable widths, either as open pit benches or underground stopes, and the high grades will make up for the sub-optimal geometry. All the Mt Hope North RC results look pretty decent to me as well and they are reasonably close to the surface
- Forums
- ASX - By Stock
- CNB
- Ann: Mount Hope Discovery - 37m @ approx. 5% Copper
Ann: Mount Hope Discovery - 37m @ approx. 5% Copper, page-67
-
-
- There are more pages in this discussion • 121 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CNB (ASX) to my watchlist
|
|||||
Last
56.5¢ |
Change
-0.005(0.88%) |
Mkt cap ! $97.14M |
Open | High | Low | Value | Volume |
57.0¢ | 57.5¢ | 55.0¢ | $235.3K | 416.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 999 | 56.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
57.5¢ | 9571 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 999 | 0.565 |
1 | 20164 | 0.560 |
1 | 15000 | 0.555 |
1 | 200 | 0.550 |
2 | 40000 | 0.540 |
Price($) | Vol. | No. |
---|---|---|
0.575 | 9571 | 1 |
0.580 | 37936 | 2 |
0.585 | 35000 | 1 |
0.590 | 20000 | 1 |
0.600 | 52141 | 2 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
CNB (ASX) Chart |