SP, I suggest you call Tony James and get briefed. I'll be nebulous and simply say an "entrepreneur" can sell the dream and make it sound simple, but generally E's are sloppy on the detail. God, how many times have we seen this play out.
In most instances the E is out of town with his saddlebag loaded with the fortunes of his spruiking and the "builder", who has to be across the detail because his faults will become apparent, is called in to build the dream. Plus, "measure twice and cut once" is an old tailer term that holds true in our circumstance. End of...for me.
- Forums
- ASX - By Stock
- CRB
- Ann: Mount Morgan Project Update and Option Extension
Ann: Mount Morgan Project Update and Option Extension, page-19
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRB (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.207M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1400000 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2058242 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1400000 | 0.004 |
10 | 17052278 | 0.003 |
2 | 1700000 | 0.002 |
3 | 2900000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2058242 | 4 |
0.006 | 2200000 | 2 |
0.011 | 9000 | 1 |
0.012 | 957 | 1 |
0.000 | 0 | 0 |
Last trade - 16.12pm 01/10/2024 (20 minute delay) ? |
Featured News
CRB (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online