fairenough, each to their own, some quick refresh finds the following
I read an August 2016 preso (slide 7) and see the following process units;
-Copper circuit (RIP) to make copper sulphate
-pyrite circuit (concentrate flotation) to make pyrite concentrate
-Gold circuit (CIL) to make gold bullion
August 2017 preso (slide 14);
-Copper resin in pulp (RIP) to make copper sulphate
-Pyrite concentration to make pyrite concentrate
-Gold carbon in leach (CIL) to make gold bullion
adding pH adjustment icons is not changing a flowsheet, it's adding detail to a visual schematic
As i said, the only reason i'm still bullish on the project is that it hasn't changed
This will be a very good money spinner!!
- Forums
- ASX - By Stock
- Ann: Mount Morgan Project Update and Option Extension
fairenough, each to their own, some quick refresh finds the...
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRB (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.206M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $749 | 187.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 3113797 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 913228 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 3113797 | 0.004 |
5 | 16605001 | 0.003 |
1 | 700000 | 0.002 |
1 | 800000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 913228 | 2 |
0.006 | 729797 | 2 |
0.011 | 9000 | 1 |
0.012 | 957 | 1 |
0.000 | 0 | 0 |
Last trade - 16.10pm 02/07/2024 (20 minute delay) ? |
Featured News
CRB (ASX) Chart |