from a positive note there can't be any problem with this option to acquire as they have had to pay Patrick another 200k to extend.
It looks like the demo plant and the EA are connected. It does appear that they are always chasing the better option as it looks like some better tech is being use in Asia.
It does read like the end result will be a game changer and they want to do it right, albeit late than desirable.
I think they are using this to get this absolutely right as remember their plan is to continue with mine rehab as their "thing" going forward.
At least they still open to the best option for tech and not blinding sailing on to the end. Carbine and GR want to make this absolute winner and some patented processes as well I think.
Waiting waiting
GLTA
- Forums
- ASX - By Stock
- CRB
- Ann: Mount Morgan Project Update and Option Extension
Ann: Mount Morgan Project Update and Option Extension, page-4
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRB (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.207M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1400000 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2058242 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1400000 | 0.004 |
10 | 17052278 | 0.003 |
2 | 1700000 | 0.002 |
3 | 2900000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2058242 | 4 |
0.006 | 2200000 | 2 |
0.011 | 9000 | 1 |
0.012 | 957 | 1 |
0.000 | 0 | 0 |
Last trade - 16.12pm 01/10/2024 (20 minute delay) ? |
Featured News
CRB (ASX) Chart |
Day chart unavailable
The Watchlist
BM8
BATTERY AGE MINERALS LTD
Nigel Broomham, CEO
Nigel Broomham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online