CRB 0.00% 0.4¢ carbine resources limited

Ann: MOUNT MORGAN SCOPING STUDY CONFIRMS POTENTIAL FOR OPERATION, page-11

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 34,155 Posts.
    lightbulb Created with Sketch. 1884
    "It looks like fantasy to me. How can their cash costs possibly be that low"
    Yes mining costs probably relate to a loader transporting taillings to a mill hopper
    I ran some numbers 59 employees at $120K each per anum came in at around $7M or $7 a ton for labor based on a 1Mtpa thorughput they had $6.20 a ton cost
    grid power at around 10c kwh and using a 4Mw plant (guessing that would be the size ) 8000 hours per annum (90% up time) came in at around their costs
    0.10 * 4000 * 8000 =$3.2M = $3.20 a ton (they had $3.40)
    They mention a 7Mw transfomer but I doubt if they would pull more than 70% from it .
    Could not get a handle on consumable costs (floculants cyanide ball mill media ) so took their word on it
    CAPEX does seem high based on the process flow sheet for a 1 Mtpa plant with no front end and much of the infrastructure in place or not needed ie accomodation ,airstrip, power supply transmission roading
    ie I am sure they could get a small 1mtpa second hand ball mill for around $1M and reline it for $500k
    and reagents at $8M seems over the top.
    Just one thing most tailings reprocessing operations look great on paper but tend to fail.
    Any way bought a few
 
watchlist Created with Sketch. Add CRB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.