Good update but I am really getting frustrated with environmental processes in NT. How can a site right next to INPEX, which had the worlds largest environmental assessments, also require this level of flora and fauna etc etc assessment and review. I remember multi-year dolphin surveys for that project for example...surely some of that could be taken off the INPEX shelf and rebranded TNG. It boggles my mind why NT didn't asses the whole area in advance - it was always going to be downstream processing or heavy industry. I hope INPEX is supporting these neighboring projects...INPEX was always sold as the enabling project for the development of Middle Arm.
Also, wait for the greenies to get their bloody vegan teeth into the Harbor based site....then add in water use and source etc....any excuse at the moment...here we go...
But....I am still positive-ish
- Forums
- ASX - By Stock
- Ann: Mount Peake - Darwin EIS & Mine Site MMP Progress
Good update but I am really getting frustrated with...
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.6¢ |
Change
-0.001(2.13%) |
Mkt cap ! $81.11M |
Open | High | Low | Value | Volume |
4.8¢ | 4.8¢ | 4.6¢ | $56.98K | 1.210M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 198235 | 4.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 12945 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 198235 | 0.046 |
9 | 944088 | 0.045 |
1 | 227295 | 0.044 |
1 | 13000 | 0.043 |
1 | 70000 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 12945 | 1 |
0.049 | 579450 | 2 |
0.050 | 6398474 | 6 |
0.053 | 147612 | 1 |
0.055 | 300000 | 1 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |