RBR 0.00% 0.2¢ rbr group limited

Ann: Mozambique Activities Update, page-220

  1. 1,010 Posts.
    lightbulb Created with Sketch. 51
    https://www.upstreamonline.com/exclusive/exxonmobil-fires-up-fresh-bid-battle-for-transformed-lng-project-in-mozambique/2-1-1425434

    ExxonMobil fires up fresh bid battle for transformed LNG project in Mozambique

    Supermajor has boosted the size of Rovuma LNG plant and opts for new construction approach

    ExxonMobil has fired the starting pistol on a fresh engineering and construction bid process on its transformed Rovuma LNG plant in Mozambique, a facility now much bigger than it was before and which will be built using a cheaper and faster modular approach.

    The US giant’s pursuit of a new construction philosophy as well as the details of its scaled-up liquefaction plant confirmed an Upstream report in July 2022.

    This redesign and the related details of an expression of interest document issued by ExxonMobil raise questions about whether the joint venture selected in 2019 to build the original LNG facility can retain that prestigious engineering, procurement and construction contract.

    https://www.eni.com/en-IT/operations/mozambique-rovuma-lng.html
 
watchlist Created with Sketch. Add RBR (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $3.268M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
4 2335570 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 10814724 11
View Market Depth
Last trade - 10.06am 10/05/2024 (20 minute delay) ?
RBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.