TPD 0.00% 21.0¢ talon energy ltd

Ann: MR Olmos Project - Sixty Day Production Update, page-2

  1. 8,316 Posts.
    lightbulb Created with Sketch. 180
    MR Olmos Project – Sixty Day Production Update


    Talon Petroleum Limited (ASX: TPD) (“Talon” or “Company”) is pleased to announce
    that during the first two months of production the Quintanilla OL 1H produced 21,766
    boe (18,592 bo +19,040 mcf) on restricted chokes. The current production rate is 464
    boepd (388 bopd +456 mcfd) on a 13/64 inch choke.
    upload_2014-12-12_13-39-43.png

    Periods showing no production are due primarily to paraffin accumulation in the choke
    manifold as a result of cold weather. Cliff Foss, President and CEO stated that “we
    are extremely happy with the excellent well performance during the first 60 days of
    production while on the restricted chokes. We are particularly excited that the original
    2900 psi flowing casing pressure has only declined to 2000 psi after producing 21,766
    boe during the first 60 days. Although it is early in the well’s productive life, the
    pressure data continues to remain extremely encouraging”.
    The company has a 10% working interest in this lease and holds a 100% working
    interest in 3600 acres adjoining the Quintanilla lease, subject to third parties options to
    acquire collectively a 50% WI.
 
watchlist Created with Sketch. Add TPD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.