Exactly as predicted.
1) Improved their efficiency rates to 54.3% from 50%, and hit a 160,000 dmt rate.
2) Improved product quality by lowering mica content to 1.83%
Looking good, the product quality is getting progressively better, and by the end of the year, we should be able to reach peak performance, with hopefully, lower mica, and higher grade spodumene, once the final circuit is refurbished in Q3-2017.
I think prices, were driven down, to buy shares cheaper, and realise a higher gain, this is typical of the market, before news. And GXY typically releases good news on Tuesdays.
- Forums
- ASX - By Stock
- Ann: Mt Cattlin Shipping Update
Exactly as predicted. 1) Improved their efficiency rates to...
-
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online