I assume the plan will be similar. Infra at Yandan, low grade ore from Yandan processed via HL, high grade ore from Koala/Glen Eva, the deeper high grade ore at Yandan and then TH to be processed via CIL. Possible Cu/Ag credits (we have some pretty smart metallurgical knowledge in this company). If AISC of $1k was accurate we have increased margins 130% and increased resource base about 5-6x without further drilling. Pick a number but it's a lot higher than that base case and a lot higher than our current MC
- Forums
- ASX - By Stock
- GBZ
- Ann: Mt Coolon Gold Project Scoping Study
Ann: Mt Coolon Gold Project Scoping Study, page-5
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBZ (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.41M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.9¢ | $832 | 92.40K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 2494520 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 166597 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 2219520 | 0.008 |
4 | 1400000 | 0.007 |
1 | 250000 | 0.006 |
3 | 2370000 | 0.005 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 166597 | 2 |
0.010 | 1609449 | 5 |
0.011 | 655299 | 2 |
0.012 | 1156448 | 4 |
0.013 | 1322442 | 3 |
Last trade - 14.40pm 26/07/2024 (20 minute delay) ? |
Featured News
GBZ (ASX) Chart |