TBA 0.00% 2.6¢ tombola gold ltd

Ann: Mt Freda Complex Global JORC Resource Estimate, page-47

  1. 24,386 Posts.
    lightbulb Created with Sketch. 176
    Like another poster wrote....YAWN..

    Compare it with this one Meteor.

    ""(This is what a good gold projects looks like. And it has now been


    •32 diamond holes have been drilled into the project delivering numerous high grade intersections including: ◦2m @ 32.4g/t gold from 19m
    ◦1m @ 958.4g/t gold from 239m
    ◦2.5m @ 38g/t gold from 174m
    ◦3.9m @ 39g/t gold from 121m
    ◦3m @ 19.9g/t gold from 214m
    ◦1m @ 125.9 g/t gold from 83m
    ◦3.1 @ 14.4g/t gold from 59m
    ◦3.1m @ 16g/t gold from 101m

    •Santa Teresa has an existing Mineral Resource estimate of 64,000oz Au Inferred grading at 8.7g/t, reported at a 4g/t cut-off. However, individual assay grades were capped to 20g/t)""

    Yep , look at their cut off grade. And guess what they are buying the mine for.?? $20mill.

    Most importantly, and different to our cut off grade, they have those results at none other than 4g/t not like ours at Cut-off 0.5g/t Au.

    Go figure.

    Yawn again.

    How much does it cost to get gold and processing it ready to sell for, at .5g/t.??
 
watchlist Created with Sketch. Add TBA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.