Was expecting much better tbh.
IRR 10% hard pass.
RFR have 156% even though much smaller project.
All about return at the end of the day.
Honestly thought this NPV would be much higher, credit recoveries was the big unknown until now.
GLTAH.
- Forums
- ASX - By Stock
- TGN
- Ann: Mt Mulgine Project Pre-Feasibility Study
Ann: Mt Mulgine Project Pre-Feasibility Study, page-5
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TGN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $34.60M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1000000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.7¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1000000 | 0.050 |
1 | 50000 | 0.047 |
2 | 23255 | 0.043 |
1 | 100000 | 0.040 |
1 | 58882 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.057 | 50000 | 1 |
0.059 | 50000 | 1 |
0.061 | 3665 | 1 |
0.064 | 23004 | 1 |
0.065 | 50000 | 1 |
Last trade - 16.12pm 13/09/2024 (20 minute delay) ? |
Featured News
TGN (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online