You could of course be right about a surface obstruction.
My point is that these two holes will be drilled further southwards, and quite possibly, they will end up being the closest holes to tenement R63/4 that have yet to be drilled by GAL at Callisto.
Having said this, in about 4 weeks, CNJ/GSR will begin their own extensive drilling program within tenement R63/4, which will of course be the ultimate test.
Cheers.
GSR Price at posting:
4.9¢ Sentiment: Buy Disclosure: Not Held