WMG 0.00% 34.5¢ western mines group ltd

In our recent presentation we stated Mt Keith as 1,900m x 400m...

  1. 764 Posts.
    lightbulb Created with Sketch. 163
    In our recent presentation we stated Mt Keith as

    1,900m x 400m and I assume 300m deep

    We also stated that Mt Keith was 643.7Mt at 0.58% NI

    This is rough but to test that if we use 1,900m x 400m x 300m x 2.7 I get roughly 615.6Mt so very close to our presentation of 643.7Mt

    We believe we have area already of 1,600m long and we also stated that any future drill out is looking for > 500,000 tonnes of Ni at cut off > 0.25% in the top 200m to 300m. At only 500,000t and using just AUD $30,000t we could have already AUD $15b in ground value.
    I think our MD is being conservative at 500,000t.

    If the hole we just started drilling now MTP024 joins up with MTD023 and MTD020 then we have another area of about 1,600m as well meaning of the 5km length we could be looking at 3.2km mineralised.

    NEXT HOLE AND ADDITIONAL PLANNED HOLES
    The rig has now moved to the east and has commenced drilling planned hole MTP024 (that will become
    MTD026 upon completion). Hole MTP024 is located approximately halfway between holes MTD023 (EIS1) and
    MTD020. Both of these holes showed extensive intersections of disseminated sulphide mineralisation, with hole
    MTD020 being the first significant occurrence during the Phase 1 drilling program. The hole will attempt to test
    the footprint of this mineralisation across the body of the complex.







 
watchlist Created with Sketch. Add WMG (ASX) to my watchlist
(20min delay)
Last
34.5¢
Change
0.000(0.00%)
Mkt cap ! $26.22M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 22000 36.0¢
 

Sellers (Offers)

Price($) Vol. No.
38.5¢ 1625 1
View Market Depth
Last trade - 16.12pm 21/06/2024 (20 minute delay) ?
WMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.