Reaming is where you go back over an already drilled section of hole with the pumps on and bit rotating. Its pretty much the same process you'd go through while drilling a hole in a piece of wood....you drill the hole and then run the drill through the hole a few times to clean up the hole.
Wiping is the process of moving the string in or out of the hole but without rotation or pumps.
Reaming comes in two flavours - normal reaming down and back reaming where you ream as you pull back the string. Reaming is commonly done during drilling at each connection.
In this case any sharp bends (dog legs) in the hole are being reamed to minimise risk of wireline tools hanging up at these points.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-1 Sidetrack - Multiple Zones of Interest
Ann: Mukuyu-1 Sidetrack - Multiple Zones of Interest, page-34
-
-
- There are more pages in this discussion • 399 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $106.1M |
Open | High | Low | Value | Volume |
7.1¢ | 7.2¢ | 7.0¢ | $103.8K | 1.479M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 642613 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 151490 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 642613 | 0.069 |
8 | 694705 | 0.068 |
6 | 809984 | 0.067 |
4 | 554117 | 0.066 |
10 | 922560 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.073 | 151490 | 3 |
0.074 | 724171 | 4 |
0.075 | 1193787 | 4 |
0.076 | 1187581 | 4 |
0.077 | 697428 | 2 |
Last trade - 15.33pm 14/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
SPONSORED BY The Market Online