Reaming is where you go back over an already drilled section of hole with the pumps on and bit rotating. Its pretty much the same process you'd go through while drilling a hole in a piece of wood....you drill the hole and then run the drill through the hole a few times to clean up the hole.
Wiping is the process of moving the string in or out of the hole but without rotation or pumps.
Reaming comes in two flavours - normal reaming down and back reaming where you ream as you pull back the string. Reaming is commonly done during drilling at each connection.
In this case any sharp bends (dog legs) in the hole are being reamed to minimise risk of wireline tools hanging up at these points.
- Forums
- ASX - By Stock
- Ann: Mukuyu-1 Sidetrack - Multiple Zones of Interest
Reaming is where you go back over an already drilled section of...
-
-
- There are more pages in this discussion • 399 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some
HCH
Hot Chili sets up water company as drought racks Chile–but must also build communities a desal plant
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $94.99M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $77.45K | 1.145M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 151496 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 2500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 151496 | 0.066 |
6 | 918720 | 0.065 |
2 | 250999 | 0.064 |
7 | 878900 | 0.063 |
5 | 566774 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 2500 | 1 |
0.069 | 121225 | 2 |
0.070 | 474981 | 4 |
0.071 | 370417 | 2 |
0.072 | 580000 | 3 |
Last trade - 15.57pm 11/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |